Let's take a look at the South Grid charging pile with telegram installation

Location:Home - News
2023.02.07

Why must the property agree to install charging piles in the community? Why am I paying for this?


According to survey data from the Guangzhou Municipal Bureau of Statistics, the output of new energy electric vehicles in Guangzhou in the first half of this year increased by 1.2 times year-on-year. Correspondingly, the demand for charging facilities has also increased. Due to the lack of understanding of relevant policies, citizens often ask soul torture during the application process: Why must the property agree to install charging piles in the community? Why hand over so many materials? Why is investment so calculated, with so much money? In this regard, the reporter made a comprehensive combing.


微信图片_20220812150931.jpg

What documents are required for processing? Why is property consent required for installation in a residential area?


A: According to the Notice of the National Development and Reform Commission, the National Energy Administration, the Ministry of Industry and Information Technology, and the Ministry of Housing and Urban-Rural Development on Accelerating the Construction of Electric Vehicle Charging Infrastructure in Residential Areas (Fa Gai Energy [2016] No. 1611) and the annex "Model Text for the Construction and Management of Electric Vehicle Charging Infrastructure in Residential Areas" and Article 278 of the Civil Code, the telegraph materials for charging piles are mainly divided into two types of materials: identity certificate and proof of ownership of the electricity address and property. For projects that occupy public places in the community (such as community parking lots, etc.), the consent for the installation and construction of electric vehicle charging piles issued by the owners' committee, property committee or property management company is required. In addition, the charging pile is allowed to use telegraph equipment, such as agency, you need to provide the identity certificate of the agent and a power of attorney.


In Guangzhou charging pile with telegram installation materials are more concise, the installation process is also very convenient, citizens do not need to run to the offline business hall, directly scan the code to download the "South Network Online" APP or open the WeChat mini program "China Southern Power Grid 95598" can handle the charging pile telegram installation business online.


If the committee/property management company does not cooperate, what kind of documents should be shown to him?


A: According to the Implementation Opinions of the National Development and Reform Commission and Other Departments on Further Improving the Service Guarantee Capacity of Electric Vehicle Charging Infrastructure (Fa Gai Energy Regulation [2022] No. 53), residential community management units should clarify the specific process of charging facilities construction in property service areas based on their own actual conditions; Users should actively cooperate with the installation of charging facilities and provide necessary assistance.


Cooperate with the owner or its entrusted unit to handle the installation and construction consent of electric vehicle charging pile; Cooperate with and assist in on-site investigation and construction in a timely manner, provide relevant drawings or identify the location of power sources and the direction of buried pipelines in the parking area.


Where the property management institution refuses to issue relevant opinions, the local county (city, district) housing and construction department shall supervise the implementation.


What should I do if I cannot provide proof of property ownership?


Answer: Valid certification documents or power supply certification documents with the authority to prove property ownership can be provided that have been verified by the government of Zhenjie and above.


If I only rent a parking space, what kind of property ownership certificate can I provide when applying for electricity use at the charging pile?


Answer: 1. If the lessor is a business committee/property company/developer: proof of the right to use the parking space for more than one year (including one year) can be provided.


2. If the lessor is an individual: In addition to the proof of ownership of the parking space, the rental contract, the consent of the parking space owner and the guarantee materials must also be provided.


3. If the lessor is the housing management department: the "Rental Housing Certificate (lease contract) and consent form recorded by the housing management department can be provided.


Do I need to pay for the construction of charging piles?


Answer: According to the relevant provisions of the state, the property rights demarcation point is the boundary point between the operation, maintenance and management of the two parties to the supply and consumption of electricity and the scope of safety responsibility, and the metering device (meter) is installed at the property rights demarcation point. There is no charge for the external line works (including meter boxes and meters) of low-voltage charging facilities connected to the power grid.


What should I pay attention to when investing in the construction of charging infrastructure projects?


A: According to the Notice of the Guangzhou Municipal Bureau of Industry and Information Technology on Issuing Guidelines for Relevant Specifications and Guidelines for Site Planning, Construction, Operation and Maintenance and Safety Management of Electric Vehicle Charging Infrastructure in Guangzhou (Sui Gong Letter [2020] No. 260), before starting construction of commercial public and enterprise-specific charging facility projects, the investment and construction entity should go through the registration and filing procedures with the industrial and information technology department of the project area.


In addition, the document also states that operators of public and private charging facilities should bear the main responsibility for the safety of the operation of public and private charging facilities; The owner of self-use charging facilities shall bear the main responsibility for the safety of the operation of self-use charging facilities. The entity responsible for the safety of charging facilities shall perform regular inspection, maintenance, overhaul and other duties of charging facilities, and promptly eliminate various potential safety hazards.